Skip to content

Yakama Forest Products in White Swan, Washington on the Yakama Reservation may receive an air permit from EPA Region 10, as a proposed plan has been announced.

Yakama Forest Products Renewal Air Quality Permit Opportunity for Public Comment on Yakama Reservation

Yakama Forest Products, located in White Swan, Washington on the Yakama Reservation, has a proposed...
Yakama Forest Products, located in White Swan, Washington on the Yakama Reservation, has a proposed air permit from EPA Region 10.

Yakama Forest Products in White Swan, Washington on the Yakama Reservation may receive an air permit from EPA Region 10, as a proposed plan has been announced.

The Environmental Protection Agency (EPA) has announced a public comment period for the proposed renewal of the air quality permit for Yakama Forest Products, located on the Yakama Reservation. The draft permit is available for public comment and can be accessed on the EPA Region 10 website.

During the comment period, which lasts 30 days from the date of the public notice, stakeholders and members of the public can submit their comments on the permit proposal. Comments can be sent via email to r10_air_permits@our website, or through other methods specified in the EPA's public notice document.

The public notice for the Yakama Forest Products P71 Draft Permit Renewal is available as a PDF (79.11 KB). The draft operating permit itself, titled R10-T5-12-02-00, is also available as a PDF (432.86 KB).

For any questions regarding the draft permit or submission methods, contact the specified contact information. It is recommended to download and open the administrative record PDF using a PDF Reader software to access its features.

The Draft Statement of Basis for P71 Renewal for Yakama Forest Products is also available as a PDF (617.95 KB), and the Draft Administrative Record for Yakama Forest Products is available as a PDF (11.17 MB).

Other submission methods for comments on the draft permit, as mentioned earlier, can be found in the attached notice below. The public comment period for the draft permit closes on September 12, 2025.

It is important to note that the draft permit pertains to air quality, and the public comment process is required by 40 CFR 71.11(a)(5) and 71.8. For more information, consult the official EPA Region 10 public notice released for this permit, typically available on the EPA Region 10 website or through a Federal Register notice.

Users are advised to carefully review the draft permit and the associated documents before submitting their comments, and to ensure they follow the correct submission methods as specified in the public notice. The subject line of the email for comments on the draft permit should read "Draft Yakama Forest Products Title V Permit".

Read also:

Latest