Energy repair operations scheduled for energy workers from August 1st to August 18th
In the coming weeks, various parts of Yakutsk and its surrounding districts will experience power supply restrictions and repair works on overhead lines (OHL) and substations. Here's a rundown of the scheduled maintenance and restrictions for August 2022.
August 1
On August 1, several locations in Yakutsk city will experience power supply restrictions, including: - Magansky Tr. 8 km partially - Kynat 2 - Suburban: Ozernaya 6, 6/1a, 50 Years of the Soviet Army 31/1-39, R. Zorge 11/1, Rechnikov 18, 18/1, 50 Years of the Soviet Army 25/3-29, Babushkina 1-13 - Zhataev (Building 1-20, 1-44, Khatin, Zolotoy 2-42, Oblachny 1-11, 13, 13/1, Detskiy 1-10, 30-42, Sokrovishcha 1-19, Lyubimyy 13, Skazochniy 2, 3, 6, 16, 18, Druzhniy 11-16, Vtoroy 1-24, Progress 1, 2, 9, Perspektivny 2, 7, 8, Rota Vetryov 1-12, Kristallnaya 3-21 (odd side), 28-30, Safirny 4-12, 4/1-16/1, Slavniy 1, 8, Arkticheskiy 1-12, Lunniy 2, 6, 8, 9, Zemnoy 21, Topolnoy 4-48 (even side), 15-51 (odd side), Romashkov 6-35, 53-85 (odd side), 48-80 (even side), 97, Slavniy partially, Romantikov (even), Stolichnaya 19-33 (odd side), 50-86 (even side), 51-37 (odd side), Romantikov 11, Festivny 20, 24, Sportivnaya 12, 26, Yasnaya Polyana 13, 15, 17, Glavniy 5, 7, 9, 11, 20, 22, Sportivnaya 19, Zemnoy 74-54 (even side), 49-91 (even side), Gribnoy 48-74, 51-73, Yablonnaya 9-73, 60-94 (even side), 82-98 (even side), Topolnoy 67, 71, (odd side), 70-88 (even side), 97, 101, Zemlyanichnaya 55-35 (odd side), Bogaty 4-10, Gorodskoy, Polarnaya Zvezda, Bolshaya 1-3, Zvezdniy 2-6, Optimistov 2-12, Pobeda, Pribrezhniy.
August 2-7
During these days, Kysyl-Syr undergoes technical maintenance of equipment on a power station and repair works on OHL. Specific locations affected include: - On 6 August: Administration of s. Kysyl-Syr, Post Office, Library, Sports Hall, Vetuchastok, SHPK, m-n Artik - On 7 August: Ammosova 72-82, Lesnaya 1-2, Novaya 1
In the Tompinsky District, Techtyur (60 let Oktyabrya Street), Oktyabr'sk (partially, Molodezhnaya near the highway) is undergoing work on power lines from August 5-8.
Namtsy undergoes capital repair of overhead lines from August 6-7, affecting locations such as M. Ammosova 35-45, Kooperativa lane.
August 8
On August 8, Kysyl-Syr continues its repair works on OHL, with Letyaniki Khomustakh being the focus.
August 9-17
Namtsy (Lenskaya southern part, Stroitel'naya southern part) undergoes capital repair of overhead lines from 9:30-17:00 on August 9.
Sardanga in the Suntarsky District is undergoing ongoing repairs at the power station on August 1.
Sygyinnakh, Kharyyalakh, Frunze undergo technical maintenance of equipment at the substation on August 15.
August 18-31
On August 18, Frunze is undergoing technical maintenance of equipment at the substation.
Byliktakh, Dyagdal in the Tompinsky District are undergoing work at the substation on August 20.
On August 20, Kyureng-At undergoes capital repair of OHL.
On August 27, power supply restrictions will also occur at various locations including Sandy Lane 6/1, 9/1, 12//1, 12/2, 26/3, Circumferential Highway 7, 9/1, 9/2, 11/2, 13, 80, Zhornitskogo 9-59/1, Yakutskaya 2/8-29, Pioneer 4-42, Energy Workers Quarter 50A, Peschanaya St, Builders St 15-39, Dalnaya 42-105, S. Danilova 2, 2/1, 2/2, 2/3, Burnashova Lane 3, Semiletka 18A, 20, 22, 24, Hatyn-Yuryakhskoe Ring Lane 1, 2, 3, 5, 6, 7, 11, 8th of March St 46,106, Gerzen St 1, 3, 5, 6, 8, 11, 15, 16, 23, 24, 25, 32, 34, 36, 37, 44, 45, 46, Pekarskogo 39-111, Khloponin St 67/3, 67/4, Portovoye Koltso 17, 18, 22, 27, 29, 31, Mirninskaya 17/2, Kommunarov 2-40, Ryndzinsky 1a, 1/1, 2/1, 3, 4, 5, 6, Khloponin St 39, 45 51, 53, 55, 57, 59, 63, K. Tsitkina 4/3, 4/4, Magansky Lane 1-16, 29, 31, Suvorova 2, 3, 5, 7, 8, 13, 14, 16, 19, 21, 22/1, 26, 26/1, 27, 31 - access for SMM crew for works on HV lines.
Throughout August, specialists in the Republic of Sakha (Yakutia) continue their daily work to connect new subscribers to electrical networks and repair overhead lines and electrical network facilities.
- In the general-news sector, reports reveal ongoing power supply restrictions and repair works on overhead lines (OHL) and substations in various regions of Yakutsk, as the industry prepares for capital repairs, maintenance, and equipment upgrades throughout August 2022.
- Amid these ongoing updates, the finance industry should beware of potential volatility in the energy sector, given the significant impact of power outages and repairs on businesses in Yakutsk and its surrounding districts.
- Meanwhile, sports enthusiasts might need to adapt their routines due to changes in facility availability. For instance, on August 6, the Sports Hall in Kysyl-Syr will experience a power outage as part of ongoing repair works on a local power station and overhead lines (OHL).