Hey there! Let me fill you in on the latest with that shut-down coal mine in Altenkirchen, Palatinate. The owner of the mine, United Consolidated Hard Coal Mining Union Breitenbach GmbH (a BASF subsidiary), tried to pull a fast one, but the Administrative Court of Neustadt an der Weinstraße ain't having it. The court just rejected a lawsuit against ordered remediation measures.

The issue? Significant ground subsidence and surface collapses above the former mine site since 2019. As cool as it sounded to have a natural sinkhole, talks between the owner and the Structural and Approval Directorate (SGD) South didn't produce an agreement. As a result, the SGD South took matters into its own hands, ordering measures for securing and remediation - and declaring them immediate action required.

The owner initially tried to stall with an interim legal protection bid, but the Administrative Court had other plans. The court also ruled the lawsuit unfounded. Harmful soil changes, they said, were undeniably due to the former coal mine. If the owner still has a bone to pick, they can throw a Hail Mary to the Higher Administrative Court, but it's looking grim.

  • Securing Measures
  • Altenkirchen
  • Mine Subsidence
  • Palatinate
  • Remediation
  • Administrative Court Battle
  • Grievance Rejected
  • Neustadt an der Weinstraße
  • Breitenbach
  • Legal Squabbles
  • BASF
  1. The Administrative Court of Neustadt an der Weinstraße has rejected a lawsuit filed by United Consolidated Hard Coal Mining Union Breitenbach GmbH (a BASF subsidiary), ending a legal squabble over securing measures for an abandoned mine in Altenkirchen, Palatinate.
  2. The immediate action required for securing and remediation of the mine site was ordered due to significant ground subsidence and surface collapses since 2019, as talks between the owner and the Structural and Approval Directorate (SGD) South failed to produce an agreement.
  3. The court battle between the owner and the SGD South over environmentally-focused finance and the production of energy from the former coal mine in Altenkirchen has finally come to a close, with the Administrative Court upholding the remediation measures.